Schedule for This Old House

This Old House

This Old House

An inspector arrives to approve the foundation installing the perimeter drain, which keeps groundwater away from the house precut framing lumber arrives the landscape plan starting the framing process the numbering system for the panels.

2026-01-14 12:00:00 +0000 UTC2026-01-14 12:30:00 +0000 UTC(30m)