Schedule for This Old House

This Old House

This Old House

Hand-patching sidewall shingles installing ductwork for the hydronic heating and cooling system finishing up the rough electrical with dimmable LED recessed lighting installing a pocket door kit.

2026-06-09 00:32:00 +0000 UTC2026-06-09 01:00:00 +0000 UTC(28m)