Schedule for This Old House

This Old House

This Old House

The last steps of the stucco system, embedded mesh for strength and crack protection and a top layer with integrated color and a sand texture new period-appropriate ornamental ironwork how the reproduction tile for the project is being hand glazed.

2025-12-29 20:00:00 +0000 UTC2025-12-29 20:30:00 +0000 UTC(30m)